Zhufeng pharmaceutical 300 tons/year cordyceps sinensis fermentation general contracting project

Project overview:
Place: Xining biotechnology industrial park, Qinghai province
Introduce: Equipment production, process pipeline and automation general contracting project for 300 tons/year cordyceps sinensis fermentation project

Construction content:
Equipment production, installation, and mixing system installation
The production and installation of stainless steel platforms in the fermentation workshop, ingredient workshop, and refining room
Pipeline installation engineering (steam pipelines, process pipelines, circulating water pipes, air conditioning chilled water, chilled salt water pipes, compressed air pipes, nitrogen pipelines, and other pipelines within the scope of the drawings)
Manufacturing and installation of equipment and pipeline supports

Site overview: